Speeding up your paint and work schedule

Fast drying
  • Very fast recoat schedules
  • Apply a complete paint system in one working day
Fast track - a complete coating system applied in one day
  • WaterFine Primer is designed to speed up the production process without using traditional fast evaporating organic solvents
    • Very fast dry-to-recoat 
    • Very fast dry-to-handle
  • At 23°C a coat of 100 microns DFT is surface dry after only 1 hour, and can be recoated after 2 hours 
Structural steel
  • Normally coated with 1 or 2 coats of high build epoxy, potentially with a topcoat